Notice: Undefined variable: MzKPGNUMD in /home/p5n40l2wq8jf/public_html/estpresse.mu/wp-includes/category.php on line 1

Notice: Undefined variable: YnUJhCL in /home/p5n40l2wq8jf/public_html/estpresse.mu/wp-includes/rest-api/endpoints/class-wp-rest-users-controller.php on line 1
Counter Measure Works to Slope Failure at Montagne Ory | Est Presse
Sunday, April 28, 2024
spot_img
HomeCommuniquéCounter Measure Works to Slope Failure at Montagne Ory

Counter Measure Works to Slope Failure at Montagne Ory

Temporary Closure of One Lane of B46 Montagne Ory Road for the counter measure Slope Stabilisation Works for the RDA project Contract E/W/RDA /17/12-019

The Public is hereby informed that Sotravic Ltee will carry out Slope Stabilisation Works for the RDA along Montagne Ory Road from 17 May 2021 up to 30 November 2021.

One lane of the road will be closed temporarily during the duration of the Works. Traffic lights will be put in place to control traffic during the execution of the Works.

Appropriate traffic signs will be posted to guide drivers of the proposed lane closure. A speed limit of 40 km/hr will be applicable when approaching the Works Area. Drivers are strongly advised to exercise caution when approaching the works area and to drive within the prevailing speed limit.

The Ministry regrets any inconvenience caused and relies on the usual collaboration and cooperation of the public.

13 May 2021
Ministry of Land Transport and Light Rail

Latest Articles